Interior installation
Install an accessible valve on the appropriate building drain while protecting the finished space and future maintenance route.
Learn more
Primary installation service
A complete installation pathway for homeowners who want to reduce sewer-backup risk with the right valve, location, permit, inspection and maintenance access.
What to know
The valve must be selected and located for the actual building drain or private sewer connection. Existing cleanouts, branch connections, basement fixtures, stormwater connections and the number of dwelling units can affect whether an installation is appropriate.
Project context
Interior work commonly involves concrete removal and restoration around the building drain. Exterior work can preserve finished basement space but may involve deeper excavation, utility locates, shoring, access risers and surface restoration.

Owner handover
Work should remain visible for the required inspection. The owner should receive the final scope, valve information, access location, photographs, inspection records, operating limits and maintenance instructions.
Project checklist
Use the assessment, authority requirements and written scope rather than choosing from a generic product package.
Related next steps

Install an accessible valve on the appropriate building drain while protecting the finished space and future maintenance route.
Learn more
Protect the correct private sewer connection while keeping inspection and maintenance access at the surface.
Learn more
Confirm which private connections serve the home before choosing one valve, two valves or a different flood-protection measure.
Learn more
The useful question is not only the price of the valve—it is the complete assessed, inspected and maintainable installation scope.
Learn moreFrequently asked questions
Timing varies with access, depth, concrete or excavation work, inspections and restoration. The assessment should establish a realistic project sequence.
A permanent access cover or riser must remain available so the valve can be inspected, cleaned and repaired.
Photos and a call can help with early screening, but a reliable installation scope normally requires property and sewer information.
No contractor can guarantee municipal approval. Documentation support can be provided, while the programme administrator decides eligibility and payment.
Next step
Open the short assessment form. The fields appear immediately on the next screen, or call us now.