
Markham installations
Property-specific assessment, installation planning, permit awareness and maintenance support for homeowners in Markham.
Learn more
High-value exterior projects
Protect the correct private sewer connection while keeping inspection and maintenance access at the surface.
What to know
An exterior installation can avoid opening a finished basement floor and may provide direct surface access to deeper storm or sanitary laterals. It is not appropriate for every property and may not qualify under every municipal programme.
Project context
The project may require Ontario One Call locates, private-utility review, depth and soil assessment, excavation protection, groundwater control, compatible pipe connections, bedding, inspection, backfill, compaction and restoration.

Owner handover
The installed valve and cleanout or access arrangement should be clearly identified and protected from soil, debris, settlement and landscaping changes. Future owners need to know what each riser reaches.
Project checklist
Use the assessment, authority requirements and written scope rather than choosing from a generic product package.
Related next steps

Property-specific assessment, installation planning, permit awareness and maintenance support for homeowners in Markham.
Learn more
Confirm which private connections serve the home before choosing one valve, two valves or a different flood-protection measure.
Learn more
Reduce assumptions before concrete is opened or a deep exterior excavation begins.
Learn more
See how assessment, installation, inspection, access and records fit together in a typical residential project.
Learn moreFrequently asked questions
No. Markham publishes outdoor-valve categories, while Halton’s current backwater-valve subsidy requires an interior installation.
Depth varies by property and sewer layout. Deep work requires appropriate excavation planning and safety controls.
Some homes have separate storm and sanitary connections or multiple eligible sewer connections. The layout and programme rules must be confirmed.
The quotation should state the excavation footprint, backfill, compaction and included surface restoration.
Next step
Open the short assessment form. The fields appear immediately on the next screen, or call us now.