Assessment
Reduce assumptions before concrete is opened or a deep exterior excavation begins.
Learn more
Prepare work for the authority having jurisdiction
Keep the installation visible, documented and ready for the required municipal review.
What to know
Requirements vary by municipality and by the plumbing work involved. The project scope should identify the application, drawings or contractor information required.
Project context
Do not restore concrete, backfill or conceal the installation before the required inspection has occurred.

Owner handover
The homeowner should retain permit, inspection, invoices, photographs, product information and any correction records for maintenance, resale and programme applications.
Project checklist
Use the assessment, authority requirements and written scope rather than choosing from a generic product package.
Related next steps

Reduce assumptions before concrete is opened or a deep exterior excavation begins.
Learn more
A complete installation pathway for homeowners who want to reduce sewer-backup risk with the right valve, location, permit, inspection and maintenance access.
Learn more
Keep the flap, seal, body and access clear so an installed valve can move freely when reverse flow occurs.
Learn more
Provide the assessment information needed to prepare or schedule a reliable quotation.
Learn moreFrequently asked questions
Installation and material alterations must be completed through the appropriate qualified and licensed plumbing professionals and applicable permits.
Photos and records can help, but a reliable scope may require inspection or camera evidence.
No. The responsible authority makes permit, inspection and programme decisions.
BackwaterValves.ca focuses on backwater valves. Broader flood-protection services are available through FloodReady.ca where appropriate.
Next step
Open the short assessment form. The fields appear immediately on the next screen, or call us now.