Pre-approval, permits and inspection.

Project sequence

Pre-approval, permits and inspection.

The order matters: an eligible installation can still lose programme support if required steps are missed.

  • Residential valve specialist
  • Permit and inspection aware
  • Toronto and GTA service

What to know

Pre-approval is programme-specific.

Markham’s current programme requires technical review and approval before new work. Other programmes may not use the same pre-approval model.

Project context

Permits authorize the regulated installation scope.

The municipality may require drawings, contractor information, fees and site inspection. Permit approval is not a flood-free guarantee or programme payment.

Permits authorize the regulated installation scope.

Owner handover

Inspection occurs before concealment.

Coordinate the installer, inspector and restoration sequence so the valve and connections remain visible when required.

Project checklist

Keep the decision specific to the property.

Use the assessment, authority requirements and written scope rather than choosing from a generic product package.

  • Technical review where required
  • Building or plumbing permit
  • Licensed-contractor requirement
  • Pre-concealment inspection
  • Final application sequence

Related next steps

Continue with the closest matching pathway.

Markham guide

Markham guide

Markham’s current programme is extended through April 2027 and includes separate published maximums for eligible indoor and outdoor storm or sanitary backwater valves, subject to pre-approval, technical review, permit and inspection requirements.

Learn more
Toronto guide

Toronto guide

As of May 1, 2026, Toronto offers up to $6,650 per eligible property. Eligible backwater-valve work is subsidized at 80% up to $1,600 per device, to a maximum of two devices, subject to City requirements.

Learn more

Frequently asked questions

Important scope and homeowner questions.

Does a rebate application replace a permit?

No.

Can the valve be covered before inspection?

Not when the authority needs to inspect it. Follow the permit instructions.

Does a passed inspection guarantee subsidy payment?

No. Inspection and programme eligibility are separate decisions.

Who should confirm the sequence?

Use the official programme and municipal building information before work begins.

Next step

Ready to take the next step?

Open the short assessment form. The fields appear immediately on the next screen, or call us now.

Call nowBook assessment